Skip to main content

Three operational pillars

Three routes to putting technology in its rightful place

All three start in the same place: looking at what you have today and writing it down. Then the architecture, then the work, then somebody who keeps it running.

Infrastructure inside the country, monitored automatically

The services we run are measured every few minutes, and the readings are published on the status page.

100.00% availability, 30 days

Request an audit

The difference in practice

How this differs from an ordinary consulting project

The difference is in how the work is done, not in the list of services. Five phases, each with a stated duration, a written deliverable and a way back.

On KaraHub The usual approach
Starting out A written audit of what you have today, before any proposal A solution proposed in the first meeting, before seeing the infrastructure
Downtime risk A pilot with a small group, then a cutover with the old system still running One move over a weekend, with no way back
Ownership Your data and configuration are yours, handed over at the end Dependency on tooling and access only the contractor holds
Reporting Measured figures, monthly, that you can check A qualitative write-up at the end of the project

See how we work